Project Summary: Our client engaged BCLG Solutions to re-develop and optimize the conceptual design for a 21 MW power plant supporting nickel mining operations. The facility comprised six HFO generator units (2 KATO and 4 Baylor) and full balance-of-plant systems.
BCLG Scope: BCLG Solutions executed multidisciplinary engineering including process, mechanical, instrumentation, electrical, electromechanical, protection and control, and communications systems. The design ensured grid compliance, operational reliability, and procurement readiness for timely and efficient execution.