Detailed Engineering for 110 MW Solar Power Development
Detailed Engineering for 110 MW Solar Power Development
Client: Confidential Location: Trinidad & Tobago
Project Summary: Our client needed detailed electrical and integration engineering for Project LARA, a 112 MW solar power initiative consisting of the Brechin Castle Solar Project (92.22 MW) and the Orange Grove Solar Project (20 MW), interconnected with T&TEC’s Brechin Castle, Orange Grove, and Piarco substations.
BCLG Scope: BCLG Solutions delivered basic and detailed electrical engineering, grid connection design, and integration studies. The scope also included compliance documentation and support for T&TEC interconnection requirements, ensuring full alignment with international utility-scale solar standards.