Expansion Engineering for Substation 345/138/13.8 kV

Expansion Engineering for Substation 345/138/13.8 kV

Client: Confidential
Location: Corsicana, Texas, USA

Project Summary:
Our client required comprehensive engineering and project management support for the 600 MW expansion of the existing Substation (345/138/13.8 kV).

BCLG Scope:
BCLG Solutions provided technical assistance, civil earthworks and drainage design, review of third-party engineering, and power system studies including load flow, short-circuit, and protection coordination. The scope also encompassed complete 3D substation modeling and support during factory acceptance testing to ensure design integrity and constructability.